How to Design Detailed Drawings Before the Construction of a Steel Structure Factory Building?

2025-05-10    296

Steel Structure

The detailed drawing design for steel structure factory buildings is typically carried out by the fabrication contractor. To meet this new requirement, the workflow for steel structure factory buildings should generally follow this sequence:

  1. Plant detail drawing design → Technical design unit approves the sample drawings

  2. Steel processing → Finished product transportation → On-site installation

  3. Material ordering → Material transportation → Material delivery

  4. The detailed drawing design by the fabrication plant integrates factory conditions with construction practices, combining advanced technology and high economic efficiency. Detailed drawings must comply with the technical design documents from the construction unit, as well as specifications, standards, and requirements outlined in the contract. This necessitates that the fabrication contractor possesses sufficient capability for detailed drawing design.

  5. To expedite steel procurement (ordering), steel materials should be ordered concurrently with the detailed design phase. This ensures that production can commence immediately upon approval of the detailed drawings, with materials arriving promptly.